Job Description
Internship - Congestion Management - Time-based sensitivity analysis of flexibility means
Requisition ID:
11029
Posting Start Date:
07/05/2026
Function
The internship takes place in the Grid Development department, within the Power System Planning (PSP) team.
The objective is to develop tools enabling time-based sensitivity analyses of grid reinforcement projects and their impact on flexibility requirements.
Main activities include:
- Developing a tool that maps client flexibility needs to overloaded grid assets.
- Identifying relevant grid reinforcement projects within the Infrastructure Investment Portfolio.
- Performing time-based sensitivity analyses of reinforcement project schedules.
- Quantifying the impact of scheduling shifts on required flexibility solutions, considering project interdependencies.
Your Profile
- Master’s student in Civil Engineering.
- Strong interest in power systems, grid planning and energy transition.
- Knowledge of or interest in:
- Python scripting
- Optimization
- Power system analysis
- Strong analytical and structured problem-solving skills.
- Ability to collaborate effectively in a technical environment.
- Knowledge of Dutch and/or French and/or English.
Offer
- A technically challenging internship with societal relevance.
- Close supervision by experienced engineers.
- Development of advanced technical and analytical skills.
- A collaborative, multidisciplinary working environment.
- Period: Summer period
- Duration: 4 to 8 weeks
- Driving licence: Not required
Location
Elia – Monnoyer site
Quai Léon Monnoyer 3, 1000 Brussels